Hendry County Road Watch for March 3-9

Posted 3/1/24

This weekly report is prepared by the Florida Department of Transportation (FDOT) to inform the public about upcoming road work in Southwest Florida.

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

Hendry County Road Watch for March 3-9

Posted

BARTOW, Fla. – This weekly report is prepared by the Florida Department of Transportation (FDOT) to inform the public about upcoming road work in Southwest Florida. Below are the work schedule and lane closure locations for major state road projects.

Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.

As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state. If you know before you go, you can plan accordingly and save time and money.

US 27 Sidewalks in Clewiston at various locations and from Royal Palm Avenue and Ponce De Leon Avenue: Construction project: Crews will be adding sidewalks along the north and south side of US 27, the east side of San Luiz Avenue, the west side of Berner Road, and on US 27 extending north along Ponce De Leon Avenue and Royal Palm Avenue to Balboa Plaza. Additional work includes drainage improvements and resurfacing the intersection between US 27 and Berner Road, side streets, and turnouts. During sidewalk construction, pedestrian detours will be in place; please follow signage. During construction there may be lane closures on Berner Road, San Luiz Avenue, Royal Palm Avenue, and Ponce DeLeon Avenue. Please use caution and watch for crews working in the work zone.

  • Motorists should expect San Luiz Avenue to be closed through February with nighttime paving through the end of February.

US 27 from Palm Beach County line to east of San Diego Street: Construction project: Crews will be resurfacing US 27 from the Palm Beach County line to east of San Diego Street, widening and paving road shoulders along medians, making drainage improvements and cross slope corrections, replacing guardrail, reconstructing ADA ramps to ensure compliance, and install signing and pavement markings.  During construction there will be lane closures on US 27 from the Palm Beach County line to east of San Diego Street. Please use caution in the area and watch for workers in the work zones.

  • Motorists should expect periodic lane closures on US 27 southbound and northbound for paving activities.

Estimated completion is early 2024.

Comments

x